Schedule
Week 1: Foundation and Flooring
Goal
Establish the foundation, install the floor frame, and lay the floor panels.
Class Agenda (4 Hours)
- Introduction to Tools & Safety (30 min)
- Review PPE usage: safety glasses, gloves, hearing protection, etc.
- Introduce tools (drills, circular/miter saw, wireless nailer, speed square, metal shears, etc.).
-
Emphasize safety protocols when handling power tools.
-
Foundation Layout (1 hour)
- Measure and mark the shed’s footprint on the ground.
- Place concrete blocks and ensure they are level and square.
-
Discuss drainage considerations to prevent water pooling under the shed.
-
Installing Floor Joists (1.5 hours)
- Cut and install pressure-treated 2x6 joists.
- Secure joists with hangers and exterior-grade screws.
-
Check for proper spacing (commonly 16” on-center).
-
Floor Panels (1 hour)
- Vapor Barrier Clarification: A dedicated vapor barrier is generally not required for raised sheds built with pressure-treated wood. However, proper ventilation or a moisture barrier can be considered for extremely damp conditions.
- Install tongue-and-groove plywood floor panels.
- Fasten floor panels every 8” along each joist for secure installation.
- Cover the foundation with a tarp at the end of the day to protect it from weather.
Non-Class (Teacher) Work
- Double-check that the foundation remains square and level.
- Finish securing floor panels if not completed during class.
- Organize and store tools and materials for the next session.
Recommended YouTube Videos
Week 2: Walls and Windows
Goal
Frame and install the walls and windows.
Class Agenda (4 Hours)
- Wall Framing Basics (30 min)
- Discuss framing techniques, measuring studs, and wall layout using a chalk line or speed square.
-
Emphasize proper nailing patterns and maintaining a square frame.
-
Build Wall Frames (1.5 hours)
- Measure, cut, and assemble 2x4 studs according to wall height specifications.
- Raise frames for all four walls and secure them to the floor.
-
Sheathing/Siding: Mark openings for doors and windows before cutting.
-
Install Windows and Door (1.5 hours)
- Cut openings for windows and the pre-hung door in the framing.
- Secure window and door frames, add flashing around the edges, and fill gaps with spray foam insulation.
Note: Temporary bracing is optional but may be used for safety or additional support.
Non-Class (Teacher) Work
- Finalize any wall frame attachments or corrections.
- Pre-cut siding/sheathing panels if time allows.
Recommended YouTube Videos
Week 3: Roofing and Insulation
Goal
Install the roof structure, sheathing, and insulation.
Class Agenda (4 Hours)
- Roof Framing (1 hour)
- Measure, cut, and install 2x4 rafters at the correct pitch.
-
Secure rafters to the top wall plates using hurricane ties/storm ties.
-
Install Roof Sheathing (1 hour)
- Cut plywood sheets to fit between rafters.
- Skylight Installation: Use clear plexiglass covered with frosted film.
-
Attach plywood securely with screws or nails.
-
Roof Insulation and Vapor Barrier (1 hour)
- Install insulation (batts or rigid foam) in the roof cavity.
- Staple a vapor barrier under roof panels.
-
Add underlayment (felt paper or synthetic roll) on top of roof sheathing.
-
Install Corrugated Roof Panels (1 hour)
- Secure metal panels using roofing screws with rubber washers.
- Seal edges with flashing tape and polyurethane sealant.
Non-Class (Teacher) Work
- Finish installing or trimming the roof panels if not completed in class.
- Check seals, flashing, and ties for weather tightness.
Recommended YouTube Videos
Week 4: Siding, Finishing Touches, and Interior
Goal
Install siding, paint the exterior, and complete interior finish work.
Class Agenda (4 Hours)
- Install Siding Panels (1.5 hours)
- Position and secure dual-purpose plywood siding to the wall frames.
-
Seal gaps with exterior-grade sealant.
-
Exterior Paint (30 min)
-
Apply waterproofing stain or exterior paint to siding and exposed wood.
-
Interior Insulation & Wall Panels (1.5 hours)
- Install stone wool insulation in wall cavities.
- Secure hardboard panels or drywall to interior studs.
-
Add a pegboard on one wall for tool organization.
-
Final Touches (30 min)
- Install door knobs, flashing, and roof drip edges.
- Install a ductless mini-split system for heating/cooling.
- Mount gutters to manage roof runoff.
Non-Class (Teacher) Work
- Add built-in shelving or storage if needed.
- Test the mini-split system.
- Conduct a final walkthrough.
Recommended YouTube Videos
Additional Course Notes
- Teacher-Managed Homework/Prep
- Organize and set out tools/materials before each class.
-
Pre-cut wood pieces to optimize class hours.
-
Parental Assistance (Optional)
-
Adults may help with heavy lifting or measurements outside of class.
-
Weekly Post-Class Review
- Dedicate 15 minutes at the end of each class to review progress and plan ahead.
By following this schedule, students gain hands-on experience in carpentry, project management, tool safety, and finishing techniques. At the end of 4 weeks, you will have a fully functional winter workshop shed and a wealth of new skills!